Electrical Upgrades

All of our Pump Stations have been upgraded recently to be more efficient with energy. Most of the upgrades include the following new components:

  • 480V Electrical Service and Transformer
  • Motor Control Center (MCC with Variable Frequency Drive (VFD)
  • Master Electrical Panel and Switches
  • Heating and Ventilation system components
  • Emergency Generator Connection
List of Electric Upgrades
  • Route 12 Pump Station – 2010
  • Lee Street Pump Station – 2013
  • Oakdale Well – 2014
  • Pleasant Valley Well – 2015
  • Lee Street Well – 2016